We have been working on this Job for a few Years now, We are doing it in stages.
Stage 1
We removed old sidding, windows & doors, Replaced them with new one
We put new Cedar Board and Bat siding on the House
Stage 2
We built the Lower back Porches,Porches are covered with Spantex (Water proffing system)
Railing system is all clear cedar with built in Flower Boxs
Stage 3
Set the new roof line, and roofed the back of the House.
(Perfect Climate did all the Gas lines for the Tikki Torches and Heaters)
Stage 4
Built front Covered Porch
roofed the front of the house
Stage 5
Built front Deck system
(Railing and deck cover not done yet)
Stage 6
built 1/2 of the front retaining wall
had fill dirt moved in
Started Pond and Waterfall construction
Next stage will be to
finish front retaining wall and landscaping
Railing system on front porch
Spantex floor of front porch
New steps to front porch
Bridge over corner of Pond
New concrete apron in front of House